Service

Certification and tie-ins

The chlorination certificate and sample results pack, plus primary tie-ins to the existing Scottish Water network, so the main is ready to connect.


  • Certificate pack
  • Sample results
  • Primary tie-ins
  • Ready to connect

Service overview

The certificate is what gets a new main connected. Once the main has been tested, disinfected and sampled, we assemble the full pack the water authority and Building Control expect to see: the chlorination certificate, the pressure test record and the UKAS lab sample results, in one auditable set. You do not have to chase paperwork from three different places.

We also handle the primary tie-ins to the existing Scottish Water infrastructure as part of the job, rather than subbing them out to a third party. One firm takes the main from an open trench to a signed certificate and a live connection, with one point of contact the whole way.

Key benefits

  • One complete packThe chlorination certificate, pressure test record and sample results assembled in one auditable set.
  • What the authority acceptsThe pack is built for what the water authority and Building Control need to permit connection.
  • Primary tie-ins handledTie-ins to the existing Scottish Water network done as part of the job, not subbed out.
  • No paperwork chasingYou get the full record from one firm, rather than chasing documents from separate trades.
  • One point of contactThe same firm that laid and commissioned the main issues the pack, so nothing is lost in handover.
  • Ready to connectThe main is handed over signed off and ready for a live Scottish Water connection.

What's included

  • Chlorination certificate
  • Data-logged pressure test record
  • UKAS lab sample results
  • The full compliance pack, assembled
  • Primary tie-ins to Scottish Water
  • One point of contact throughout
  1. 01

    Swabbing and pre-commission cleaning

    A foam swab is driven through the length of the main to push out trapped air and the debris left behind during installation.

    Stage focus:

    • Foam swabbing
    • Air removal
    • Debris clearance
  2. 02

    Hydrostatic pressure testing

    The main is filled, brought up to working pressure and held, then monitored against the allowable loss for the pipe and length. We test PE, MDPE, barrier and ductile.

    Stage focus:

    • PE and MDPE
    • Barrier and ductile
    • Working pressure
  3. 03

    Chlorination and disinfection

    A dosed disinfection solution is introduced and held in the main for the required contact time, then dechlorinated and flushed down to the network residual.

    Stage focus:

    • Dosing
    • Contact time
    • Dechlorination
  4. 04

    Bacteriological sampling

    Water samples are drawn from the disinfected main and sent for laboratory analysis against the potable standard.

    Stage focus:

    • UKAS lab
    • Coliforms & E. coli
    • Potable standard
  5. 05

    Certification

    The results from every stage are assembled into the auditable certificate pack that Scottish Water accepts to permit connection.

    Stage focus:

    • Certificate pack
    • Audit trail
    • Scottish Water accepted

Questions

Common questions

If yours is not here, call and ask.

Get a Quote
What is in the certificate pack?

The chlorination certificate, the data-logged pressure test record and the UKAS lab bacteriological sample results, assembled into one auditable set. It is the record the water authority and Building Control need to permit the main to be connected and made live.

Do you handle the tie-in to Scottish Water?

Yes. We handle primary tie-ins to the existing Scottish Water network as part of the job, rather than subbing them out. One firm takes the main from open trench to a signed certificate and a live connection, with one point of contact throughout.

How quickly do we get the pack?

The pack is assembled once the sample result comes back from the UKAS lab, which is usually a few days after sampling. Because we hold the pressure test and chlorination records already, there is no waiting on paperwork from separate trades.

Related services

  • New mains, supplied and laid

    Scotland-wide supply, lay, construction and testing of new water, fire, sprinkler and rising mains as a WIRS accredited contractor.

  • Pressure testing

    Data-logged hydrostatic testing to prove the main holds working pressure before tie-in.

  • Swabbing, chlorination and sampling

    Swab and flush the pipe clean, dose to a high-strength chlorine residual for the contact time, dechlorinate, then take UKAS-lab samples.

Send your site drawings. Get a fixed quote back.

Email them over or give us a call. You get a clear price, a date that fits your programme, and the compliance pack at the end. No pressure, no jargon.